Nepean Hospital – Tower Building 1
Project Overview
The Nepean Redevelopment will deliver contemporary and expanded hospital services, and integrated community health facilities for the Nepean Blue Mountains Local Health District. The redevelopment of the Nepean Hospital is being carried out in stages. The NSW Government has committed $550 million to deliver Stage 1 and $450 million to deliver Stage 2. This will also include the construction of a $26 million multi-storey car park on Barber Avenue to support the expanded services on campus. An expansion and upgrade of services is also being carried out on the Nepean Cancer Care Centre, Blue Mountains Satellite Renal Dialysis Centre and Somerset Cottage.
Scope of Work:
• Potable cold, hot and warm water reticulation;
• Natural gas hot water generation;
• Natural gas reticulation;
• Rainwater harvesting (ACS-VPR-003);
• Limited in-ground stormwater drainage services to an agreed civil interface;
• Roof drainage system;
• Condensate collection system;
• Sanitary fixtures and fittings;
• Provision of fire proofing and acoustic treatment of the piping installation;
• Identification and signage;
• Provision of contractual submissions as described in this section and the General clauses,
including construction drawings, as built drawings, manuals, QA Plans, etc.;
• Connection to services at agreed battery limits;
• Items not included in the specification but shown on the drawings or vice versa may be included
as part of this contract;
• Points of connection and coordination with other trades including, but not limited to, builder,
civil, landscape, mechanical, fire, electrical and BMS contractors;
• Connection to all equipment as indicated;
• Preparation of work method statements;
• Training of all employees and subcontractors on work method statements;
• Supply and installation of all tool, plant and equipment necessary to carry out the work in a safe
manner and to the relevant codes; and
• Testing and commissioning of hydraulic services listed above